Metal Building Construction on Lakeshore in Orlando: A Sovanic, Inc. Case Study

Metal Building Construction on Lakeshore in Orlando: A Sovanic, Inc. Case Study

Building near a lakeshore in Orlando means facing unique challenges few contractors fully master. You need a metal building Orlando expert who understands local codes, wind loads, and waterfront conditions inside and out. This case study reveals how Sovanic, Inc. delivered a turnkey pre-engineered metal building (PEMB) project that met every requirement while standing strong against Florida’s elements. Keep reading to see what sets this commercial metal building apart—and how your project can benefit.

Preconstruction Strategy

With any construction project, a strong start is key. For our lakeshore metal building in Orlando, the initial steps were crucial in setting the foundation for success.

Site Assessment and Floodplain Review

Building by the water requires special attention to detail. Our team began with a thorough site assessment. We focused on understanding the terrain and potential flood risks. This helped us choose the safest and most practical building location. We used advanced tools to analyze the floodplain, ensuring our building would withstand nature’s challenges. These insights allowed us to develop a plan that prioritized safety and compliance.

Budgeting and Procurement Planning

Budgeting is more than just numbers. It’s about creating a realistic roadmap. We broke down costs into clear, manageable segments. This included everything from materials to labor, ensuring there were no surprises. Our procurement team worked hard to find the best quality materials at competitive prices. This approach not only saved money but also ensured timely delivery. By focusing on smart planning, we kept the project on track and within budget.

Design-Build Coordination

Once the groundwork was laid, our focus shifted to coordinating design and build processes. This phase was crucial in bringing the vision to life while maintaining structural integrity.

Foundation Engineering and Wind-Load Analysis

In Florida, wind is a serious factor. Our engineers conducted a detailed wind-load analysis. We designed foundations specifically to handle strong gusts common in the area. By using cutting-edge techniques, our foundation met both local regulations and our high standards. This careful planning ensured the building would stand firm even in harsh weather. The results? A secure structure, ready to face Florida’s forceful winds.

Envelope Performance and Value Engineering

The building’s exterior needed to be both durable and efficient. We focused on envelope performance, choosing materials that offer excellent insulation and weather resistance. Our value engineering process emphasized quality without breaking the bank. Insulated metal panels provided the perfect solution, combining strength with energy efficiency. This choice not only cut costs but also enhanced the building’s overall performance.

Structural and Environmental Execution

The final phase of our project brought together all previous efforts into a cohesive, functional structure. This stage was about execution and environment-friendly practices.

Corrosion-Resistant Steel and Standing Seam Roof

Waterfront projects demand materials that can withstand moisture and time. We chose corrosion-resistant steel for its durability. This choice was critical to prevent rust and ensure longevity. The standing seam metal roof offered both style and function. It provided excellent protection against leaks while adding a sleek look to the structure. Together, these elements created a resilient building ready for Orlando’s lakeside conditions.

Stormwater Management and Lake Protection

Protecting the lake was a top priority. We implemented a stormwater management system that safely directed runoff away from the lake. This eco-friendly approach protected local wildlife and maintained water quality. By using permeable surfaces and natural filtration techniques, we minimized environmental impact. This commitment to sustainability ensured the project not only met construction goals but also respected the natural surroundings.

In conclusion, Sovanic, Inc.’s meticulous process from assessment to execution demonstrates our dedication to quality and environmental stewardship. Whether you’re planning a commercial metal building or a custom project, the longer you wait, the longer you miss out on the benefits of professional expertise and local insight. Our case study highlights the keys to successful waterfront construction, setting the stage for your future projects.

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.
You need to agree with the terms to proceed

Menu